[Rhodes22-list] New (old) Rhodes 22 owner
Rick
sloopblueheron at gmail.com
Sun Oct 7 15:14:01 EDT 2012
Are you going to get the same structural integrity as a single sheet?
Rick
On Sun, Oct 7, 2012 at 1:13 PM, rbeytagh <rbeytagh at gmail.com> wrote:
> Good progress on no-name R22 (Maybe I'll call her Waif). About $75 spent on
> Glass Resin and Chopped strand and I have the concrete/lead ballast
> re-glassed in and the cabin sole stringers in place. The original cabin
> sole
> was a single sheet of 3/4" ply which must have been installed before the
> deck was put on... there is no way to get the new floor in as a single
> sheet. I am splitting the new floor-boards into 3 easily removal panels.
>
> <
> http://rhodes-22.1065344.n5.nabble.com/file/n44312/Stove_for_sale_003_%28851x1280%29.jpg
> >
>
> Now onto new/refurbished cabin fittings. My wife insists on an all marble
> galley.... This may not happen, but clearly the galley needs re-doing!
>
> <
> http://rhodes-22.1065344.n5.nabble.com/file/n44312/Stove_for_sale_001_%28851x1280%29.jpg
> >
>
>
>
> --
> View this message in context:
> http://rhodes-22.1065344.n5.nabble.com/New-old-Rhodes-22-owner-tp44257p44312.html
> Sent from the Rhodes 22 mailing list archive at Nabble.com.
> __________________________________________________
> To subscribe/unsubscribe go to
> http://www.rhodes22.org/mailman/listinfo/rhodes22-list
>
> For the list Charter and help with using the mailing list and archives go
> to http://www.rhodes22.org/list
> __________________________________________________
>
More information about the Rhodes22-list
mailing list