[Rhodes22-list] Composite trim
The Rhodes 22 Email List
rhodes22-list at rhodes22.org
Tue Sep 8 14:33:41 EDT 2015
Oh my bad i didnt scroll down far enough. Looks Great!!
Bob (palatka)
> On Sep 8, 2015, at 1:48 PM, The Rhodes 22 Email List <rhodes22-list at rhodes22.org> wrote:
>
> I have started trimming out the cockpit and have decided to try using
> composite deck lumber for non-structural pieces. I choose grey for that
> weathered look. The intention is that this will be maintenance free. For
> those who might be interested, a picture is attached. For the trim around
> the pop top opening and the seats I plan to see if I can bend thin strips of
> the material with a heat gun to go around corners unbroken.
>
> Graham Stewart
> Agile. R22, 1976
> Kingston Ontario Canada
>
>
>
> -----Original Message-----
> From: rhodes22-list-bounces at rhodes22.org
> [mailto:rhodes22-list-bounces at rhodes22.org] On Behalf Of The Rhodes 22 Email
> List
> Sent: August 31, 2015 2:30 PM
> To: The Rhodes 22 Email List
> Subject: Re: [Rhodes22-list] Green goop with leaks
>
> Graham,
>
> I was hoping you were going to comment on my situation. Yes, I am only
> filling the holes with epoxy. I will rebed with butyl tape since I will
> eventually have nice new round (properly sized) hole with which to bed the
> railing. I am drilling a slightly oversized 5/8 inch hole. Then I will use a
> dremel tool to take out a very small section of the core around the hole.
> Next, I will close up the bottom of the hole with some duct tape and fill
> with west systems epoxy. After a few days, I plan to redrill and countersink
> 3/8 hole and use butyl tape to rebed the railing.
>
> Chers,
> Ted
>
>
>>> On Aug 31, 2015, at 11:03 AM, The Rhodes 22 Email List
>> <rhodes22-list at rhodes22.org> wrote:
>>
>> Ted:
>> I am not sure you intend to bed the bow rail to the deck with epoxy
>> but I would not do that. Definitely the plan to remove some core
>> material in the holes and filling that with epoxy is critical to avoid
>> core rot - assuming your deck is cored with plywood. At some point
>> Stan changed from plywood to foam core but I don't know when. For
>> bedding I would use sealant (3M 4200 or equivalent - not 5200) or
>> butyl tape. I will be using butyl tape myself as it seals beautifully,
>> never hardens and is easy to remove as it has virtually no adhesive
> qualities.
>>
>>
>> Graham Stewart
>> Agile. R22, 1976
>> Kingston Ontario Canada
>>
>>
>>
>> -----Original Message-----
>> From: rhodes22-list-bounces at rhodes22.org
>> [mailto:rhodes22-list-bounces at rhodes22.org] On Behalf Of The Rhodes 22
>> Email List
>> Sent: August 30, 2015 3:21 PM
>> To: Da List
>> Subject: [Rhodes22-list] Green goop with leaks
>>
>> Hey guys, looks like I may have the dreaded deck to hull joint leaks
>> on my recycled 1991/2013. I also have slight leaks at the bow pulpit
>> through bolts. It's leaking green goopy sealant along the port side. I
>> can see it on the white/gray carpet on the side of the port hull. I
>> took off the bow railing and plan to rebed the through bolts using
>> west systems epoxy. I started to clean out the existing holes by re
>> drilling slightly larger holes and used a dremel tool remove some of
>> the core material. I feel pretty good about the repair as there are
>> lots of demonstrations on You Tube and various boating web sites.
>>
>> What is the best way to remove the rub rail to inspect the deck to
>> hull joint?
>>
>> Cheers,
>> Ted
>>
>> s/v AIRPOWER
>> Jacksonville, FL
>> 1991/2013 Rhodes 22
>>
>>
>>
>> __________________________________________________
>> To subscribe/unsubscribe go to
>> http://www.rhodes22.org/mailman/listinfo/rhodes22-list
>>
>> For the list Charter and help with using the mailing list and archives
>> go to http://www.rhodes22.org/list
>> __________________________________________________
>>
>> __________________________________________________
>> To subscribe/unsubscribe go to
>> http://www.rhodes22.org/mailman/listinfo/rhodes22-list
>>
>> For the list Charter and help with using the mailing list and archives
>> go to http://www.rhodes22.org/list
>> __________________________________________________
>
>
> __________________________________________________
> To subscribe/unsubscribe go to
> http://www.rhodes22.org/mailman/listinfo/rhodes22-list
>
> For the list Charter and help with using the mailing list and archives go to
> http://www.rhodes22.org/list
> __________________________________________________
> -------------- next part --------------
> A non-text attachment was scrubbed...
> Name: Companion way trim.jpg
> Type: image/jpeg
> Size: 180974 bytes
> Desc: not available
> Url : http://www.rhodes22.org/pipermail/rhodes22-list/attachments/20150908/4e1b8865/attachment.jpg
> __________________________________________________
> To subscribe/unsubscribe go to http://www.rhodes22.org/mailman/listinfo/rhodes22-list
>
> For the list Charter and help with using the mailing list and archives go to http://www.rhodes22.org/list
> __________________________________________________
More information about the Rhodes22-list
mailing list