[Rhodes22-list] Reconnecting the Tabernacle Screws Following Sacrificial Failure
Chris on LBI
cknell at vt.edu
Mon Aug 10 12:12:02 EDT 2020
Jesse,
I filled the holes with epoxy last week. I took photos and some notes that
I'll post ... after I step the mast. I found that a second shroud had been
damaged and I'm waiting for the winds to cooperate; we are on the water and
winds above about 6kts cause too much yawl and roll.
Chris
-----
Long Beach Island
--
Sent from: http://rhodes-22.1065344.n5.nabble.com/
More information about the Rhodes22-list
mailing list